03-12-2023, 04:53 PM
Hi,
NewRg must be before the DO LOOP loop - usually at the beginning as DIM, the rest in the DO LOOP loop. ShowRG statement have the points X, Y as the upper left corner of the graph. UpdateRG inserts the current results into the graph, ShowRG displays them. The range of inserted values is calculated from -1 to 1, zero is in the middle of the graph.
NewRg must be before the DO LOOP loop - usually at the beginning as DIM, the rest in the DO LOOP loop. ShowRG statement have the points X, Y as the upper left corner of the graph. UpdateRG inserts the current results into the graph, ShowRG displays them. The range of inserted values is calculated from -1 to 1, zero is in the middle of the graph.