06-02-2022, 12:47 PM
Here's another thought - increase the working scope of SLEEP.
So SLEEP will take a value in terms of Time but what if SLEEP AT could expand to include either a Line Number or a Loop Control, such as SLEEP AT CASE 3: SLEEP 1 ... SLEEP AT FOR I=6
In the instance of Line Number, you could have multiple Lines covered with the 1 SLEEP AT command. ie SLEEP AT LN100, LN500,LN25000
So SLEEP will take a value in terms of Time but what if SLEEP AT could expand to include either a Line Number or a Loop Control, such as SLEEP AT CASE 3: SLEEP 1 ... SLEEP AT FOR I=6
In the instance of Line Number, you could have multiple Lines covered with the 1 SLEEP AT command. ie SLEEP AT LN100, LN500,LN25000